top of page
a3e6071b-7dd1-47f5-9fea-4036070a5200.png

Wimbledon Tennis Club, London

Picture1.jpg

We were appointed by Wimbledon Tennis Club in London to deliver a full structural alteration and bar refurbishment, transforming the existing layout into a striking four-sided central bar area.

All works were completed whilst the centre remained fully open and operational, requiring careful planning, phased works, and strict health & safety management to minimise disruption to members and staff.

The project began with the removal of an existing load-bearing wall to open up the space and create the footprint required for a new four-sided bar configuration.

Our works included:

  • Installation of temporary structural supports

  • Careful demolition and removal of the load-bearing wall

  • Installation of structural steel in accordance with engineer specifications

  • Full compliance with health & safety requirements in a live environment

By removing the wall, we significantly improved sight lines, customer flow, and service capacity within the clubhouse.

Carrying out major structural works within an operational tennis club required:

  • Phased programming to avoid peak service times

  • Dust control measures and temporary screening

  • Protection to existing finishes

  • Strict site segregation and safe access routes

  • Close coordination with club management

This ensured minimal disruption to members while maintaining a safe working environment throughout.

The Result

The completed project has transformed the space into a modern, high-performance four-sided bar that:

  • Increases serving efficiency

  • Improves customer flow

  • Enhances the visual impact of the clubhouse

  • Delivers a durable, high-end finish

This project showcases our ability to deliver complex structural alterations and bespoke joinery installations within a fully operational hospitality environment, without compromising safety, programme, or quality.