Built on family values. Crafted to last.Wimbledon Tennis Club, London
Structural Alterations & Four-Sided Copper Bar Installation
We were appointed by Wimbledon Tennis Club in London to deliver a full structural alteration and bar refurbishment, transforming the existing layout into a striking four-sided central bar area.
All works were completed whilst the centre remained fully open and operational, requiring careful planning, phased works, and strict health & safety management to minimise disruption to members and staff.
The project began with the removal of an existing load-bearing wall to open up the space and create the footprint required for a new four-sided bar configuration.
Our works included:
Installation of temporary structural supports
Careful demolition and removal of the load-bearing wall
Installation of structural steel in accordance with engineer specifications
Full compliance with health & safety requirements in a live environment
By removing the wall, we significantly improved sight lines, customer flow, and service capacity within the clubhouse.
Working in a Live Environment
Carrying out major structural works within an operational tennis club required:
Phased programming to avoid peak service times
Dust control measures and temporary screening
Protection to existing finishes
Strict site segregation and safe access routes
Close coordination with club management
This ensured minimal disruption to members while maintaining a safe working environment throughout.
-
With the structure altered, we rebuilt the bar from the ground up to form a new four-sided serving area.
Works included:
Construction of a new bar framework
Bespoke joinery panelling to bar fronts and gantry
Integration of service voids and under-counter storage
Preparation for beer taps and service equipment
The new layout improves staff efficiency behind the bar while allowing service from all sides, maximising capacity during busy periods.
-
A key feature of this project was the supply and installation of a bespoke copper worktop.
Custom fabrication to suit the four-sided layout
Precision forming around corners and tap penetrations
Seamless detailing for a continuous finish
Protective sealing for durability
The copper surface creates a premium focal point and brings warmth and character to the clubhouse interior.
-
Following the structural alterations and installation, we completed all associated making good works to ensure a seamless finish:
Ceiling repairs and re-plastering
Floor making good where the wall was removed
Decoration to match existing finishes
Final snagging and detailing
The Result
The completed project has transformed the space into a modern, high-performance four-sided bar that:
Increases serving efficiency
Improves customer flow
Enhances the visual impact of the clubhouse
Delivers a durable, high-end finish
This project showcases our ability to deliver complex structural alterations and bespoke joinery installations within a fully operational hospitality environment, without compromising safety, programme, or quality.