Wimbledon Tennis Club, London

Structural Alterations & Four-Sided Copper Bar Installation

We were appointed by Wimbledon Tennis Club in London to deliver a full structural alteration and bar refurbishment, transforming the existing layout into a striking four-sided central bar area.

All works were completed whilst the centre remained fully open and operational, requiring careful planning, phased works, and strict health & safety management to minimise disruption to members and staff.

The project began with the removal of an existing load-bearing wall to open up the space and create the footprint required for a new four-sided bar configuration.

Our works included:

  • Installation of temporary structural supports

  • Careful demolition and removal of the load-bearing wall

  • Installation of structural steel in accordance with engineer specifications

  • Full compliance with health & safety requirements in a live environment

By removing the wall, we significantly improved sight lines, customer flow, and service capacity within the clubhouse.

Working in a Live Environment

Carrying out major structural works within an operational tennis club required:

  • Phased programming to avoid peak service times

  • Dust control measures and temporary screening

  • Protection to existing finishes

  • Strict site segregation and safe access routes

  • Close coordination with club management

This ensured minimal disruption to members while maintaining a safe working environment throughout.

  • With the structure altered, we rebuilt the bar from the ground up to form a new four-sided serving area.

    Works included:

    • Construction of a new bar framework

    • Bespoke joinery panelling to bar fronts and gantry

    • Integration of service voids and under-counter storage

    • Preparation for beer taps and service equipment

    The new layout improves staff efficiency behind the bar while allowing service from all sides, maximising capacity during busy periods.

  • A key feature of this project was the supply and installation of a bespoke copper worktop.

    • Custom fabrication to suit the four-sided layout

    • Precision forming around corners and tap penetrations

    • Seamless detailing for a continuous finish

    • Protective sealing for durability

    The copper surface creates a premium focal point and brings warmth and character to the clubhouse interior.

  • Following the structural alterations and installation, we completed all associated making good works to ensure a seamless finish:

    • Ceiling repairs and re-plastering

    • Floor making good where the wall was removed

    • Decoration to match existing finishes

    • Final snagging and detailing

The Result

The completed project has transformed the space into a modern, high-performance four-sided bar that:

  • Increases serving efficiency

  • Improves customer flow

  • Enhances the visual impact of the clubhouse

  • Delivers a durable, high-end finish

This project showcases our ability to deliver complex structural alterations and bespoke joinery installations within a fully operational hospitality environment, without compromising safety, programme, or quality.

 